Uncategorized

C215 Operation Management (VDC2)

Operations Management Exam Review

1. What is the role of benchmarking in total quality management (TQM)?

  • It helps in decreasing waste by eliminating errors and overproduction.
  • It helps employees identify quality issues and solve them.
  • It allows for continuous planning, doing, studying, and acting to solve problems.
  • It assesses how others do things to build an environment of continuous improvement.

2. Which ISO standard was established to verify that organizations have met all specified quality standards?

  • ISO 9000
  • ISO 26000
  • ISO 9004
  • ISO 14000

3. Which quality management tool translates customer needs into product design features?

  • Pareto analysis
  • Cause-and-effect diagram
  • Quality function deployment
  • Check sheet

4. Which quality management tool monitors whether a process remains within acceptable limits?

  • Scatter diagram
  • Check sheet
  • Cause-and-effect diagram
  • Control chart

5. Which chart helps monitor the proportion of defects in samples?

  • C-chart
  • P-chart
  • R-chart
  • S-chart

6. Which term defines the maximum output rate a facility can achieve under ideal conditions?

  • Design capacity
  • Capacity utilization
  • Effective capacity
  • Capacity planning

7. Which of the following points to a reduction in average cost per unit as production increases?

  • Focused factories
  • Diseconomies of scale
  • Best operating level
  • Economies of scale

8. Which layout is best suited for assembling identical gift baskets in large quantities?

  • Fixed position layout
  • Hybrid layout
  • Product layout
  • Process layout

9. Which system generates the gross requirements of each part in inventory?

  • Enterprise resource planning
  • Material requirements planning
  • Master production schedule
  • Manual inventory system

10. Which planning process determines overall production capacity over a medium-term period?

  • Demand planning
  • Aggregate planning
  • Master scheduling
  • Materials requirements planning

11. Which aggregate planning strategy uses inventories and backorders with a constant production rate?

  • Level plan
  • Chase plan
  • Layout plan
  • Hybrid plan

12. Which activity involves production and distribution at the appropriate time?

  • Traffic management
  • Distribution management
  • Supply chain management
  • Logistics

13. What is the main purpose of supply chain management?

  • Conducting and integrating the flow of goods and services
  • Enhancing the quality of a product or service
  • Providing customer satisfaction
  • Increasing productivity levels

14. Which phase of the project life cycle carries out the activities that make up the project?

  • Execution
  • Planning
  • Concept
  • Feasibility study

15. Which is the correct sequence of project life cycle phases?

  • Concept, Planning, Study, Execution, Termination
  • Concept, Study, Planning, Execution, Termination
  • Planning, Concept, Study, Execution, Termination
  • Study, Concept, Planning, Execution, Termination

Students place their trust in exam experts who prioritize reliability, integrity, and measurable results. Through continuous support, transparent processes, and a strong success record, ProctoredExamsExperts.com empowers learners to perform at their best while enjoying complete peace of mind.We offer the service and all you can get a copy of any Exam question from us.Just reach out.

Leave a Reply

Your email address will not be published. Required fields are marked *